Electroplating equipment production lines occupy a large share in printed circuit board manufacturing enterprises. In order to ensure the normal operation of the electroplating equipment, the stability of the operation process and the service life of the electroplating equipment, the correct protection and maintenance of the equipment is very important. So, electroplating equipment manufacturers tell you why protection is important?

1. Protection and maintenance of the circulating system filter system 7d once check the filter element of the circulating system filter system to see if it leaks. Clean or replace the filter core every 10-15 days.

2. Protection of the linear plating line and protection of the linear plating line use brackets and expanders to transfer the substrate. Clean the crane and spanners once a week (do not remove the car and spanners), adhere to the clean appearance, clean with a rag, and sand with sandpaper.

3. Protection and maintenance of conveyors in horizontal electroplating production lines The conveying equipment used in horizontal electroplating production lines is the drum, which uses the rotation of the drum to continuously feed the circuit board into each slot. Therefore, the protection of the transport equipment of the horizontal hanging plating production line is different from that of the linear plating production line.

The drums of the horizontal plating line should be sorted once for 7 days to remove dirt adhering to the drums and ensure that the surface of the conveyor plate is clean. Check that the crankshaft is down.

4. The protection and maintenance of the vibration tissue on the linear electroplating production line should be carried out on the linear electroplating. In order to ensure the uniformity of the exterior copper and the effect of the hole copper during the copper plating process, the plate will vibrate and shake, and the tank will be set to vibrate and shake the structure. Check the reducer for 30 days to see if it works normally and check its tightness; Check the fastening of the bolts installed on the motor; Check the wear of anti-vibration rubber and replace it in time if it is serious. Check the contact of power cables in the 180d junction box. When the terminal is loose, tighten it immediately. For power cables with melted or aged insulation layers, replace the power cables to ensure insulation between them.

5. Protection and maintenance of other parts 7d. It is necessary to check the output power of the power supply twice; Check the heat dissipation devices and radiators commonly used in power supplies and electrical control devices, remove dust, and clean them to prevent heat dissipation. Check all connectors, timely repair poor contact, virtual connection and virtual welding, and timely replacement in case of corrosion damage; Check all contactors and relays. If the contact is poor or stuck, please replace it in time; Check the main parameters of capacitors, reactors, resistors and other parts. If abnormal, replace as soon as possible.

6. The main difference between the protection of the storage tank and the straight plating line and the horizontal plating line is that the method of transporting the circuit board is different. Tank protection and protection methods actually vary greatly. Within 7 days, each cleaning tank should be cleaned once, and the acid cleaning tank should be cleaned once, and then the tank liquid should be removed and replaced. Check whether the automatic water spraying device in the storage tank is blocked and pass the blockage immediately.

For the conductive support on the copper and tin plating solution and the contact between the anode and the induction power transmission line, wipe once with a towel and sandpaper. Check the titanium and tin baskets of the copper plating tank and tin plating tank, replace the rotten titanium basket bags and tin baskets, add the copper ball and tin rod, add the copper ball and tin rod after 7 days, electrolytic copper plating tank and electroplating tin bath.

主站蜘蛛池模板: 欧美综合图区 | 一级毛片大片 | 欧美日韩激情亚洲国产 | 男女无套免费视频网站 | 美女视频黄又黄又免费高清 | 亚洲欧美在线不卡 | 国产精品特级露脸AV毛片 | 麻豆亚洲AV成人无码久久精品 | 午夜精品久久久久久久爽 | 亚洲人成色777777精品音频 | 午夜欧美福利 | 久久国产精品一区二区 | 国产国产精品人在线视 | 午夜影院在线 | 久久久久99精品成人片 | 麻豆最新国产剧情AV原创 | 国产视频一区二区三 | 九一免费版网站 | 蜜桃视频在线免费播放 | 护士的奶又大又粗又大 | 中文字幕中文字幕在线 | 久久久噜噜噜久久中文福利 | 国产特级毛片AAAAAA高清 | 麻豆精品一区二区av白丝在线 | 欧美一区二区三区四区不卡 | 宝可梦旅途中文版 | 狍和女人一级毛片在线看 | 伊人天天久大香线蕉AV色 | 欧洲三级在线观看 | 色视频在线免费 | 伊人国产在线视频 | 久久高清视频免费 | 成人免费国产精品视频大全 | 18禁网站在线永久免费观看 | 91影院在线| 亚洲人妖视频 | 亚洲成人av综合 | 超碰9在线 | 美女极度色诱视频国产 | 亚洲午夜成人精品无码色欲 | 国产精品高清无码在线观看 |